Electric Concrete Sleeper Bolt Drilling Machine Factory_Electric Drilling Machine_Product Introduction
In the vast sea of the Internet, it is our honor that you can see our company's promotional information. The railway equipment produced by our factory is very cost-effective. Products have been wholesaled to the outside world for many years. Shenyang Railway Bureau, Fuxin Mining Department, and Baicheng Mining are the designated manufacturers for procurement. The quality is strictly controlled and the technology and experience are mature. It is suitable for high-speed rail, subway and ordinary railway. It can be customized according to the styles required by the purchasing customers. Figure processing. Spot wholesale, cash on delivery is also available upon request.
Electric Concrete Sleeper Bolt Drilling Machine Factory_Electric Drilling Machine_Product Introduction
Liaoning Shuangxing has twenty years of professional manufacturing
Customer Consultation
Contact Manager Zhang
Address Anshan City, Liaoning Province
Office
Fax
Technical Service
Striving to create the industry-leading brand Liaoning Shuangxing
Electric Concrete Sleeper Bolt Drilling Machine Factory_Electric Drilling Machine _Product Introduction
Detailed Parameters
Electric Concrete Sleeper Bolt Drilling Machine Factory_Electric Drilling Machine_Product Introduction
Preparation before rail drilling machine operation
The installation of the drill bit is based on the on-site work If required, install a core drill bit or twist drill bit. The specific method is as follows
This manual takes the installation of a hollow drill bit as an example. Push the feed lever ⑨ toward the gasoline engine to the end.
Then lift the clamp lever ⑥ toward the gasoline engine.
Lift the drilling machine, use a wrench or your fingers to loosen the set screw at the spindle sleeve, install the drill bit core into the drill bit, then align the two flat parts with the two set screws, and insert the flower. After inserting it into the key shaft and being close to the root of the spline shaft, tighten the set screw to complete the installation. This machine is shipped with a hollow drill bit from the factory.
Drill bit removal: Lift the drilling machine according to the above steps, use a wrench to rotate the bolt counterclockwise, and remove the drill bit from the spindle sleeve.
After the operation, you must use the wrench that comes with the machine. If you use other wrenches to cause damage to the machine, you will be responsible for the consequences. Remove the drill bit and apply thin oil or rust inhibitor to the threaded hole.
Installation of positioning blocks
Choose the positioning block with the same rail model as the one given. ⑩ This positioning block is a combination dual-purpose positioning block, that is, and, and combination, respectively marked with, and the number is close to the side of the rail , indicating which rail type is to be drilled.
How to use the water injection bucket
Align the handle with the groove at the mouth of the water injection bucket and press down to the root. Rotate the handle counterclockwise until the pressing device is unscrewed. Then add coolant into the water injection bucket to prevent If the drill bit and the drilled rail hole are rusty, fill up the coolant and tighten it clockwise, then rotate it counterclockwise at a small angle, take it out from the slot at the mouth of the water injection bucket, press the handle back and forth a few times to pressurize the bottom of the water injection bucket. Insert the water pipe into the oil pipe in the fixture of the drilling machine. Hold the handle of the water outlet valve of the water injection bucket, press the water valve downward with your thumb, and push it forward to open it. At this time, press down on the drill bit core and make sure the coolant flows out of the drill bit before proceeding to the next step.
Introduction and installation of positioning ruler
This positioning ruler is divided into equal models, and the corners of the positioning ruler are marked respectively. Each positioning ruler has a positioning groove, which is processed according to the standard hole spacing of the rail.
Pull the ruler locator back, insert the locator ruler ⑤ into the clamp body, and go under the first groove.
Fill in fuel and lubricating oil
To fill in fuel, first unscrew the fuel tank cap, add the above unleaded gasoline or ethanol gasoline, then tighten the fuel tank cap,
Fill in lubricating oil First unscrew the fuel tank cap of the lubrication chamber, add gasoline engine oil in summer, and gasoline engine oil in winter until it reaches the scale mark. Do not add less or excessive gasoline oil, and tighten the fuel tank cap. Use your fingers to press the carburetor storage bubble of the gasoline engine a few times until the carburetor storage bubble is filled with gasoline.
When the temperature is lower than ℃, usually first close the damper and lift it up, increase the throttle to /, quickly pull the starting disk, and slowly put it back. After the gasoline engine starts, slowly open the damper to the maximum direction. Press down, slowly increase the throttle, idle for a few seconds, check whether the transmission part is flexible, whether there is any abnormal noise, whether the screw connection is loose, press the gasoline engine stop button, and prepare to drill.
Electric Concrete Sleeper Bolt Drilling Machine Factory_Electric Drilling Machine_Product Introduction
Liaoning Shuangxing After-sales Service Commitment
Service tenet is fast, decisive, accurate, thoughtful and thorough.
Service goals: Service quality wins customer satisfaction.
Service Efficiency If the equipment fails during or outside the warranty period, after the supplier receives notification, maintenance personnel can arrive at the site and start repairs within hours.
Service Principles The product warranty period is one to twelve months. During the warranty period, the supplier will repair and replace parts damaged due to quality reasons for free. If parts are damaged outside the warranty period, only the cost will be charged for the accessories provided. If the equipment is damaged due to human factors on the part of the buyer, any repairs or accessories provided by the supplier shall be priced at cost.
Liaoning Shuangxing produces and sells the following products
☆Railway vehicle internal combustion tamping pick tamping machine hydraulic rail hole extrusion machine hydraulic rail drilling machine manual rail drilling machine rack type track starter hydraulic track starter Rail cutting machine, square sleeper, hydraulic straight rail device, rerailer, universal gauge ruler, rail grinder, square gauge rail truck, etc.
☆Track accessories, bezels, turnouts, turnout accessories, turnout tie rods, rail gauges, rail gauges, rail gauges, rails Anchor rod b Anchor rod drill rod b pneumatic drill rod switch pad track plywood track spike insulating splint crossing switch pad composite rubber pad track fixing rail gauge tie rod guard rail buckle plate line buckle plate base insulated gauge Rod buckle plate, twist drill pipe, coal drill pipe, twist drill pipe, connection collar, chain spreader, draft drill, anchor rod, pallet, nylon baffle seat, manual switch, manual bender, bender, bender, rail press, pressure plate, fish tail plate Fishtail bolts, etc.
Liaoning Shuangxing sales network Hebei Shanxi Inner Mongolia Liaoning Jilin Heilongjiang Beijing Tianjin Shanghai Jiangsu Zhejiang Anhui Fujian Jiangxi Shandong Henan Hubei Chongqing Sichuan Guizhou Yunnan Shaanxi Gansu Ningxia Xinjiang and other places.
Note: The above content is provided by Liaoning Shuangxing Railway Machinery Co., Ltd. The relevant product parameters and pictures are for reference only. Specific products may have different origins due to different production batches. Please contact the sales staff for specific details.
Electric Concrete Sleeper Bolt Drilling Machine Factory_Electric Drilling Machine_Product Introduction